Calculators

Numbers in, answers out.

Coverage, material qty, depth, downtime, lifecycle and carbon — built for foremen, estimators and spec writers.

Field Estimators
Coverage
Area (sq ft)500 sq ft
Depth (in)1 in
Volume41.7 cu ft
50 lb Bags70
Pallet / Tote
Bag Count96 bags
Pallets (48/bag)2
Totes (2,200 lb)3
Downtime Cost
Traditional Downtime (hr)48 hr
Cost / Hour2,500 $/hr
Traditional$120,000
ZERITHON (1 hr)$2,500
Savings$117,500
Project Planning
Material Quantity
Area (sq ft)1,200 sq ft
Avg Depth (in)1.5 in
Waste Factor10 %
Total Bags275
Mix Water1787.5 gal
Tonnage6.88 tons
Repair Depth → Product
Repair Depth (in)2 in
Recommended SKUZRX-400 Rapid Slab Patch
Placement MethodSingle lift, 45-min cure

Vertical/overhead and chemical-exposure conditions override depth — confirm with the Product Advisor or PE support.

Lifecycle & Impact
Lifecycle Cost
Analysis Period (yr)20 yr
Traditional Initial $50,000 $
Traditional Re-Repair Every7 yr
Traditional Total$135,000
ZERITHON Total$70,000
Lifecycle Savings$65,000
Carbon Impact
Material Volume10 tons
Traditional (Portland)9.0 t CO₂e
ZERITHON Platform3.5 t CO₂e
CO₂ Avoided5.5 t
Tree-Years Equivalent91

Need a project-specific takeoff?

Run the AI Bid Assistant →