Drop ZERITHON into your spec set. In minutes.
Master CSI sections, UFGS / SpecsIntact files, and an AI-assisted project-edited spec generator. Everything you need to write ZERITHON into a defensible project specification.
The rules the AI — and the crew — must follow.
Every AI recommendation, bid, and spec is bound by these constraints. Violations are flagged, not silently overridden.
625 sq ft per pour. Driven by the 30-minute application + trowel window. Larger scopes must be sequenced into sections.
Do not specify for single-lift fills exceeding 6 inches. Deeper repairs require sequenced lifts.
ZERITHON cannot bridge or level lifted, heaved, or settled concrete. Correct the plane before application.
Vehicular/return-to-service loading permitted one hour after final trowel — not limited to foot traffic.
Full compressive design strength achieved at 30-day cure. Early strengths documented on Performance page.
Chemically bonds to existing concrete — no cold-joint discontinuity, no bond-breaker layer, no shear plane.
Drop-in CSI, UFGS and project-edited sections.
Maintenance of Cast-In-Place Concrete
Master CSI section covering ZRX-100, ZRX-200 and ZRX-400 for general repair, overlay and rapid patching scopes.
REQUEST EDITABLE SECTION →Non-Shrink Grouting
Specification section for ZRX-300 precision anchor grouting under machine bases, bearings and anchor bolts.
REQUEST EDITABLE SECTION →Maintenance of Cast Decks & Underlayment
Parking deck, bridge deck and elevated slab overlay specifications using ZRX-200 with ZRX-ADX climate tuning.
REQUEST EDITABLE SECTION →Repair of Concrete (Federal)
SpecsIntact master for military and federal projects, including domestic-source language and UFGS-compliant submittal sections.
REQUEST EDITABLE SECTION →Auto-generate a project-edited spec in 60 seconds.
Enter project conditions and the AI returns an editable CSI section pre-populated with the right SKU, climate pack, application limits and acceptance criteria.
Open AI Tools →
